Post Offer Free
Wolwa Group Construction Machinery Co., Ltd
Wolwa Group Construction Machinery Co., Ltd  

Gold Index: 16793

You are here: home  > Truck Crane  > Wolwa GNQY-C10 10 tons Automobile crane

Wolwa GNQY-C10 10 tons Automobile crane 

Payment Terms: T/T,L/C,WU 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Means of Transport: Ocean,Land
Packing: FCL
Brand Name: Wolwa
Production Capacity: 300sets/month
Delivery Date: 15days after receiving the ...

The crane driver must be professional and technical trained, examination qualified and getting the certificate can operate independently.

Wolwa GNQY-C10 10 tons Automobile crane introduction

Automobile crane is a kind of crane fitted on a common car chassis or special automobile chassis, its driving cab and lifting control cab is setted separately. This kind of crane is featured by good maneuverability and quick swing speed. It must be outrigger supported when working, and can't load, also not suitable for work in soft or muddy ground.

 

Wolwa GNQY-C10 10 tons Automobile crane parameter

 

model

GNQY-C10

Lift speed

53(95)m/min

Max.lifting weight

10000Kg

Swing speed

2.6/min

Max.lifting height

30m

Travel speed

75Km/h

Engine model

YN38PE-1

Outrigger base

3.97*4.2m

power

85Kw

Dimention

9.525*2.43*3.07m

Chassis model

BJ5103JQZ-1

 

 

Wolwa GNQY - C10 10 tons Automobile crane operation specification

 

The crane driver must be professional and technical trained, examination qualified and getting the certificate can operate independently.

 

 

The driver should be familiar with mechanical principle of mobile crane, maintenance rules, safety operation procedures, and strictly carry out according to regulations. It is forbidden to drink or body have not indications for operation.

Before use people should check whether the job site is flat solid in detail, leg whether firm, operating handle, brake and other operating device is sensitive and reliable, to ensure working without anything abnormal.

 

 

(4) When hook lifting, the components must be the in the direction of the rear of the lifting. Lifting must first do a try hanging, to avoid excessive lifting, minimize the objects stay in the air, suspended substance to slow even when landing. 

(5) When working, the abrasion of wire rope should be often observed. When the crane boom angle is large, the hanging material should first be down to the position, in keeping the sling tension condition, then lower hoist boom, loose rope, and pick the hook.

 

Hoist boom lift must fall back when: do not lower down the arm when lifting heavy objects. The throttle is smaller when lowing the arm and bigger when lifting. Rotary motion is to be steady, not sudden reversal, when close to the rated weight load, shall not air rotary when  the ground clearance is 0.5 m above .

 

 

It is strictly prohibited to lifting when driving, the lift arm must be put on the bracket when driving, the hook is in the bumper, and the wire rope to pull tight.

(8) After the completion of the work, lifting legs and sawing arm shall not simultaneously. Driving on the highway, it is imperative to strictly abide by the traffic rules, turning slowly, and strictly control the speed of the car on the way down.


bigPhoto
 Ms. Vera Gao

Tel: 86-537-2560983
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Wolwa Group Construction Machinery Co., Ltd [China (Mainland)]


Business Type:Manufacturer, Trading Company
City: Jining
Province/State: Shandong
Country/Region: China (Mainland)

You May Like:

Product (300)